Discussion Items-Cheyenne Airport serving passengers PowerPoint Presentation

Ppt Presentation Embed Code   Zoom Ppt Presentation

PowerPoint is the world's most popular presentation software which can let you create professional Discussion Items-Cheyenne Airport serving passengers powerpoint presentation easily and in no time. This helps you give your presentation on Discussion Items-Cheyenne Airport serving passengers in a conference, a school lecture, a business proposal, in a webinar and business and professional representations.

The uploader spent his/her valuable time to create this Discussion Items-Cheyenne Airport serving passengers powerpoint presentation slides, to share his/her useful content with the world. This ppt presentation uploaded by worldwideweb in Education & Training ppt presentation category is available for free download,and can be used according to your industries like finance, marketing, education, health and many more.

About This Presentation

Slide 1 - Cheyenne Regional Airport New Airport Terminal Project December 1, 2011
Slide 2 - Discussion Items Airport Information Existing Terminal Feasibility Study 20% Schematic Design 20% Terminal Cost Estimates Funding Scenarios Final Thoughts
Slide 3 - Airport Information Founded September 8, 1920 Two terminals 200 E. 8th Avenue (1930-1961) 300 E. 8th Avenue (1961-Present) Two Air Carriers serve Cheyenne Great Lakes Airlines (6 flights/ day to Denver) American Eagle (1 flight/day to Dallas) In 2010, over 42,000 people flew into or out of the Cheyenne Regional Airport As of September 2011, total passenger use was up over 46% from 2010.
Slide 4 - Existing Terminal Built in 1961 (50 years old) Drastically different operating environment Beyond serviceable life-span Surpassed useful life years ago, but demand shifted Numerous deficiencies: Parabolic Design – not suitable for remodel Structural failures Outdated MEP systems Inadequate parking Inadequate hold rooms Inadequate security Inefficient split-level layout
Slide 5 - Feasibility Study Summary of Process – Initial Study Aug. 2007 – Met with Board to discuss study goals Existing terminal evaluation Review capacity and forecast demand Solicit input from stakeholders, users and agencies Assess terminal alternatives at current airport (not evaluate new airport) Develop conceptual terminal diagram/solution Sep. - Oct. 2007 – Stakeholders, initial site analysis, forecast & program Nov. 2007 – Site cost assessment Dec. - Jan. 2008 – Non-site specific conceptual terminal diagram Mar. 2008 – Study summary complete
Slide 6 - Feasibility Study (Continued) Public Involvement Process Jan. 2009 – Tenant and agency update and feedback Feb. 2009 – Public update and feedback Mar. 2009 – Revisions, public update April - May 2009 – Additional revisions, public updates (if necessary) – Final site selection Conclusion of General Assessment Wide range of physical deficiencies fail to meet operational needs of the Airport Existing site will not meet operational demands of an expanding terminal Future growth cannot be accommodated using site as configured
Slide 7 - Feasibility Study (Continued) Site Alternatives 3. 5. Not viable due to insufficient depth and excessive grade change. Not viable due to insufficient depth and proximity to residential areas. Directed to look at preliminary costs. Not viable due to excessive grade change, infrastructure req.s (new taxiway on fill, etc.) also outside ALP, runway envelope conflicts 1. 2. 4. Viable Directed to look at preliminary costs. Site is constricted. Viable
Slide 8 - 20% Schematic Design $1,500,000.00 for design was approved on previous 6 Penny Ballot September 2010 – February 2011 Addressed operational needs of airlines 30,000 annual enplanements Passenger service improvements Gate hold seating, ticketing, security, concessions, and restaurants Pre-security waiting areas Viewing platforms
Slide 9 - 20% Schematic Design Efficient security check points MEP upgrades incorporating many “green” concepts Multi-story layout Additional concession space Ample, multi faceted parking New terminal apron – can accommodate longer aircraft
Slide 10 - ppt slide no 10 content not found
Slide 11 - ppt slide no 11 content not found
Slide 12 - 20% Terminal Cost Estimates
Slide 13 - Funding Scenarios From FAA – Airport Improvement Program From WYDOT Aeronautics From 6 Penny Airport Bonding/Other Funding *Approximately 28% of total project cost
Slide 14 - Final Thoughts Construction of a new terminal facility is the most flexible and cost effective means of insuring the long term sustainability of passenger service at the Cheyenne Regional Airport It is important not to think of the terminal facility as simply a building. The terminal is the most visible part of a gateway to Cheyenne that serves as both the first and last impression to visitors and residents alike